      Description

      Currently P4_CHANGELIST gives the last sync changeset id for a depot. On depots which containing a single project this will match the last changeset for that project, but when a depot hosts multiple projects the last sync'd changeset can be greater than the last changeset that affected an individual project.

      I've tested a quick patch that creates an environment variable P4_LAST_CHANGELIST with the last changeset id related to the current project, which is available here;

      https://github.com/namtabmai/perforce-plugin/commit/765dff821abf46a5eace30c28b2a991f294e38fe

      I'm not overly happy with that env name but it at least seems to work as expected on the builds I've tested it on.

        Attachments

          Issue Links

            Activity

            Hide
            rpetti Rob Petti added a comment -

            I'm not sure I follow your first paragraph... P4_CHANGELIST is the last changeset id for the workspace, not the entire depot. On depots containing multiple projects, this will only be set to the last change that is synced for that specific project as defined by the workspace view. In this way, it already does exactly what you need it to do.

            Are you just requesting that a variable be added that contains the changeset of the previous build?

            Show
            rpetti Rob Petti added a comment - I'm not sure I follow your first paragraph... P4_CHANGELIST is the last changeset id for the workspace, not the entire depot. On depots containing multiple projects, this will only be set to the last change that is synced for that specific project as defined by the workspace view. In this way, it already does exactly what you need it to do. Are you just requesting that a variable be added that contains the changeset of the previous build?
            Hide
            namtabmai _ added a comment -

            Sorry for that, maybe this example might make things a little clearer.

            Given the depot layout

            //depot/project1/test.txt
            //depot/project2/test.txt

            Which contains the history

            Change 1 by andrew@desktop on 2012/10/14 11:04:05
            Added test.txt to Project1
            Affected files ...
            ... //depot/project1/test.txt#1 add

            Change 2 by andrew@desktop on 2012/10/14 11:07:12
            Added test.txt to project2
            Affected files ...
            ... //depot/project2/test.txt#1 add

            If I'd set up a project in jenkins using the view map

            //depot/project1/... //workspace/...

            Which is simply a job that calls;

            echo "P4_CHANGELIST = $P4_CHANGELIST"

            Building this job after changeset 1 is submitted (before changeset 2 is submitted) I get the expected output

            P4_CHANGELIST = 1

            Then if I submit changeset 2 and build the project again I get the response

            P4_CHANGELIST = 2

            Am I misconstruing what P4_CHANGELIST represents? I'd expect it to be the changeset id of the last changeset associated with a project, but under all the projects I've used it with it seems to be the last sync'd changeset regardless of the workspace.

            Show
            namtabmai _ added a comment - Sorry for that, maybe this example might make things a little clearer. Given the depot layout //depot/project1/test.txt //depot/project2/test.txt Which contains the history Change 1 by andrew@desktop on 2012/10/14 11:04:05 Added test.txt to Project1 Affected files ... ... //depot/project1/test.txt#1 add Change 2 by andrew@desktop on 2012/10/14 11:07:12 Added test.txt to project2 Affected files ... ... //depot/project2/test.txt#1 add If I'd set up a project in jenkins using the view map //depot/project1/... //workspace/... Which is simply a job that calls; echo "P4_CHANGELIST = $P4_CHANGELIST" Building this job after changeset 1 is submitted (before changeset 2 is submitted) I get the expected output P4_CHANGELIST = 1 Then if I submit changeset 2 and build the project again I get the response P4_CHANGELIST = 2 Am I misconstruing what P4_CHANGELIST represents? I'd expect it to be the changeset id of the last changeset associated with a project, but under all the projects I've used it with it seems to be the last sync'd changeset regardless of the workspace.
            Hide
            namtabmai _ added a comment -

            Output log of build #2 for Project1

            Started by user Andrew West
            Building on master in workspace /var/lib/jenkins/jobs/Project1/workspace
            Using master perforce client: Project1
            [workspace] $ /usr/local/bin/p4 workspace -o Project1
            Last build changeset: 1
            [workspace] $ /usr/local/bin/p4 changes -s submitted -m 1 //...
            [workspace] $ /usr/local/bin/p4 -s changes -s submitted //Project1/...@2,@2
            Sync'ing workspace to changelist 2.
            [workspace] $ /usr/local/bin/p4 -s sync //Project1/...@2
            Sync complete, took 17 ms
            [workspace] $ /bin/sh -xe /tmp/hudson6120382511269786976.sh
            + echo P4_CHANGELIST = 2
            P4_CHANGELIST = 2
            Finished: SUCCESS

            p4d version: Rev. P4D/LINUX26X86_64/2012.2/525804 (2012/09/18).
            p4 version: Rev. P4/LINUX26X86_64/2012.2/525804 (2012/09/18).
            perforce plugin version: 1.3.17
            jenkins version: 1.485

            Show
            namtabmai _ added a comment - Output log of build #2 for Project1 Started by user Andrew West Building on master in workspace /var/lib/jenkins/jobs/Project1/workspace Using master perforce client: Project1 [workspace] $ /usr/local/bin/p4 workspace -o Project1 Last build changeset: 1 [workspace] $ /usr/local/bin/p4 changes -s submitted -m 1 //... [workspace] $ /usr/local/bin/p4 -s changes -s submitted //Project1/...@2,@2 Sync'ing workspace to changelist 2. [workspace] $ /usr/local/bin/p4 -s sync //Project1/...@2 Sync complete, took 17 ms [workspace] $ /bin/sh -xe /tmp/hudson6120382511269786976.sh + echo P4_CHANGELIST = 2 P4_CHANGELIST = 2 Finished: SUCCESS p4d version: Rev. P4D/LINUX26X86_64/2012.2/525804 (2012/09/18). p4 version: Rev. P4/LINUX26X86_64/2012.2/525804 (2012/09/18). perforce plugin version: 1.3.17 jenkins version: 1.485
            Hide
            namtabmai _ added a comment - - edited

            Apologies for this, maybe this is a bug in perforce. Ignoring jenkins for the moment and going straight to the command line

            Using the workspace path

            andrew@www:depot$ P4CLIENT=Project1 P4PORT=www:1666 p4 changes -s submitted //...
            Change 2 on 2012/10/14 by andrew@desktop 'Added test.txt to project2 '
            Change 1 on 2012/10/14 by andrew@desktop 'Added test.txt to Project1 '

            Using the depot path

            andrew@www:depot$ P4CLIENT=Project1 P4PORT=www:1666 p4 changes -s submitted //depot/project1/...
            Change 1 on 2012/10/14 by andrew@desktop 'Added test.txt to Project1

            Show
            namtabmai _ added a comment - - edited Apologies for this, maybe this is a bug in perforce. Ignoring jenkins for the moment and going straight to the command line Using the workspace path andrew@www:depot$ P4CLIENT=Project1 P4PORT=www:1666 p4 changes -s submitted //... Change 2 on 2012/10/14 by andrew@desktop 'Added test.txt to project2 ' Change 1 on 2012/10/14 by andrew@desktop 'Added test.txt to Project1 ' Using the depot path andrew@www:depot$ P4CLIENT=Project1 P4PORT=www:1666 p4 changes -s submitted //depot/project1/... Change 1 on 2012/10/14 by andrew@desktop 'Added test.txt to Project1
            Hide
            rpetti Rob Petti added a comment -

            P4_CHANGELIST should always be equal to the last change submitted to the workpsace path, ie:

            $ P4CLIENT=Project1 P4PORT=www:1666 p4 changes -s submitted //depot/project1/...
            Change 1 on 2012/10/14 by andrew@desktop 'Added test.txt to Project1
            

            It seems you are running into a bug. When you force a build to run that doesn't have any new changes it it's workspace, it falls back to using the last changeset from it's entire depot.

            Show
            rpetti Rob Petti added a comment - P4_CHANGELIST should always be equal to the last change submitted to the workpsace path, ie: $ P4CLIENT=Project1 P4PORT=www:1666 p4 changes -s submitted //depot/project1/... Change 1 on 2012/10/14 by andrew@desktop 'Added test.txt to Project1 It seems you are running into a bug. When you force a build to run that doesn't have any new changes it it's workspace, it falls back to using the last changeset from it's entire depot.
            Hide
            scm_issue_link SCM/JIRA link daemon added a comment -

            Code changed in jenkins
            User: Rob Petti
            Path:
            src/main/java/hudson/plugins/perforce/PerforceSCM.java
            http://jenkins-ci.org/commit/perforce-plugin/840c94ce920a7e43a89e21c409bb1a8d24ca6814
            Log:
            [FIXED JENKINS-15515] prefer workspace changeset before depot changeset

            Show
            scm_issue_link SCM/JIRA link daemon added a comment - Code changed in jenkins User: Rob Petti Path: src/main/java/hudson/plugins/perforce/PerforceSCM.java http://jenkins-ci.org/commit/perforce-plugin/840c94ce920a7e43a89e21c409bb1a8d24ca6814 Log: [FIXED JENKINS-15515] prefer workspace changeset before depot changeset

              People

              • Assignee:
                Unassigned
                Reporter:
                namtabmai _
              • Votes:
                1 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: