Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-18206

Total duration of a test class should include the times for the configuration methods

    Details

    • Similar Issues:

      Description

      The total time for a test class should include the configuration methods.
      Otherwise the total time reported can be quite confusing, because it's much lower than expected.

      E.g. I have on the test overview:

      Class: a.b.c.SmokeTest, Duration: 472 msec

      but when I drill down to the test, I get:
      Test Methods
      testStartup, Duration: 472 msec

      Configuration Methods
      springTestContextPrepareTestInstance, Duration 6 sec 348 msec

        Attachments

          Activity

            People

            • Assignee:
              nullin Nalin Makar
              Reporter:
              kutzi kutzi
            • Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: