-
Bug
-
Resolution: Postponed
-
Critical
-
None
If you configure a multijob all the subjobs do not execute unless there is an scm change, this is the reverse logic of the "build only on scm change" as specified in the phase configuration.
- is duplicated by
-
JENKINS-32427 MultiJob Phase configuration "Build only if SCM changes" behaves in opposite way
- Closed