Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-32917

Locked resource in use by multiple jobs

    Details

    • Similar Issues:

      Description

      I frequently see two jobs using the same resource, whereas only one job has actually locked the resource. These jobs all have a SCM configured.

      I suspect that the locking occurs too late (only after the check out). So, while the first job is updating the workspace the resource is not locked yet and the other job thinks he can use that same resource.

        Attachments

          Activity

            People

            • Assignee:
              terrapin Jan Hollevoet
              Reporter:
              terrapin Jan Hollevoet
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated: