Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-39751

Allow Sequential Exection of Jobs in phase of MultiJob

    Details

    • Similar Issues:

      Description

      I would like to have the ability to force Jobs within a Jobphase to run Sequentially.

      EX:
      PHASE1 = JOB-A then JOB-B, then JOB-C
      PHASE2 = JOB-A then JOB-B, then JOB-C

      Running Phase 1 and 2 at the same time. Would also be nice to spawn a Phase 3 after Job 1 / 2 completed all within the same "multiphase" job.

      Thanks.

        Attachments

          Activity

          mtterry Mitchell Terry created issue -
          yorammi Yoram Michaeli made changes -
          Field Original Value New Value
          Status Open [ 1 ] Closed [ 6 ]
          Resolution Postponed [ 6 ]

            People

            • Assignee:
              Unassigned
              Reporter:
              mtterry Mitchell Terry
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: