Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-47855

Multiple parameterized builds at the same time

    Details

    • Similar Issues:

      Description

      Hi, when i try to build the job two different parameterized builds at the same time, it always executes only first one. Example:

       

      0 */3 * * * % BLOCKITEM=customer
      0 */3 * * * % BLOCKITEM=document

      It will always run only build with parameter value customer. it works if I set schedule with 'H' instead of exact minutes number. But I need to run both build at the exact time.

        Attachments

          Activity

            People

            • Assignee:
              batmat Baptiste Mathus
              Reporter:
              nowaja Jakub Nowak
            • Votes:
              2 Vote for this issue
              Watchers:
              5 Start watching this issue

              Dates

              • Created:
                Updated: