-
Bug
-
Resolution: Cannot Reproduce
-
Minor
-
None
We have a job with a quite period of 20 minutes. After this job is built, several downstream jos will be build, too. When I delete the first job during the quite time, then the other jobs still wait in the queue (until the remaining time of the quite time of the deleted job is finished).
I think Hudson should either wake up the sleeping jobs or delete the downstream jobs (cascading delete).