Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-60830

job duration does not include the time spent in after finalized steps

XMLWordPrintable

    • Icon: New Feature New Feature
    • Resolution: Unresolved
    • Icon: Minor Minor
    • core
    • None

      The duration of a job is calculated directly after the normal steps and the post build steps are finished. But it doesn't include those post build steps, that have needsToRunAfterFinalized set to true and also any runlisteners of oncompleted and on finalized calls are not included.

      I propose to add an additional field totalDuration that is set as the very last thing in the Run class

            Unassigned Unassigned
            mawinter69 Markus Winter
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: