-
Bug
-
Resolution: Incomplete
-
Major
-
None
I am about to attach a screen capture that illustrates the problem.
I have 5 jobs that each do the same thing: checkout and build a JSF workarea on the same machine. I observe that the build duration gets progressively slower as each job is completed. There is nothing about each of the workspaces that differ in a way that would explain such behavior.
If I'm not able to attach it, here are the numbers from the Build Duration column.
14 min
16 min
22 min
38 min
– last one in progress as I write this, but I bet it'll be greater than 38.