Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-18196

With lazy-build loading estimated build duration may become expensive

    Details

    • Similar Issues:

      Description

      With lazy-build loading the computation for the estimated duration may become expensive:

      • it searches of the last 3 unstable (or better) builds to compute the runtime.
        In the (not very probable, but still possible) that there are a lot of builds and less than 3 have been unstable, it can be very expensive to lookup the builds.

      Limit the number to build to go back in time and maybe also consider failed builds in the calculation

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                kutzi kutzi
                Reporter:
                kutzi kutzi
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: