      It would be a nice feature to display total build time of each pipeline in the title.

        Attachments

          Activity

          Hide
          pmatignon Patrice Matignon added a comment -

          I would love to see this feature come to fruition. Let me know if I can help.

          Show
          pmatignon Patrice Matignon added a comment - I would love to see this feature come to fruition. Let me know if I can help.
          Show
          patbos Patrik Boström added a comment - Merged PR https://github.com/Diabol/delivery-pipeline-plugin/pull/103
          Hide
          patbos Patrik Boström added a comment -

          Release in 0.9.4

          Show
          patbos Patrik Boström added a comment - Release in 0.9.4
          Hide
          pmatignon Patrice Matignon added a comment -

          Thank you all for this great feature, very useful!

          I am using v0.9.5 and I see that the build times are reported as the sum of the build times for all steps. However, earlier in this thread, there was a discussion about the concurrent steps that should not be counted twice. So in this version, it does not seem to be implemented.
          Could you please clarify?

          And if confirmed, what is the general sense of what the logic should be?
          IMHO, I see value in different scenarios:

          • Actual build times, excluding concurrent steps (i.e. actual time spent building steps)
          • Total end-to-end times (pipeline time to complete), including the inactive time in case of MANUAL triggers
            So, and realizing this adds complexity, maybe a configuration for potentially multiple displays:
            [ ] show total build times
            [ ] show actual build times
            [ ] show end-to-end pipeline duration
            What is your sense, so that we can decide if a follow-up enhancement ticket should be created ? Thanks in advance!
          Show
          pmatignon Patrice Matignon added a comment - Thank you all for this great feature, very useful! I am using v0.9.5 and I see that the build times are reported as the sum of the build times for all steps. However, earlier in this thread, there was a discussion about the concurrent steps that should not be counted twice. So in this version, it does not seem to be implemented. Could you please clarify? And if confirmed, what is the general sense of what the logic should be? IMHO, I see value in different scenarios: Actual build times, excluding concurrent steps (i.e. actual time spent building steps) Total end-to-end times (pipeline time to complete), including the inactive time in case of MANUAL triggers So, and realizing this adds complexity, maybe a configuration for potentially multiple displays: [ ] show total build times [ ] show actual build times [ ] show end-to-end pipeline duration What is your sense, so that we can decide if a follow-up enhancement ticket should be created ? Thanks in advance!
          Hide
          denisby Denis Kot added a comment -

          Is it possible to use this feature in messages? I.e. in HipChat messages. Like:

          job-pipeline #3007 SUCCESSFUL after 1 min 42 sec
          
          Show
          denisby Denis Kot added a comment - Is it possible to use this feature in messages? I.e. in HipChat messages. Like: job-pipeline #3007 SUCCESSFUL after 1 min 42 sec

            People