Improvement
-
Resolution: Fixed
-
Minor
-
None
Currently, the estimated remaining time for a job is equal to the duration of the last stable or unstable build.
As build times can vary quite easily - e.g. because of the load on the build server - it would be better to take more samples.
E.g. the last 3-5 successful builds.